Rebar Detailing Services

 

Sloan Global provides state-of-the art rebar detailing services. Our team is experienced in designing RCC structures based on ACI codes and consistently delivers high-quality rebar detailing services to our clients. We strive to establish a win-win business relationship with our clients by ensuring precise, accurate, high-quality rebar detailing services within the budget and on time.

 

 

 

 

 

 

Our Process

 

  • Our Rebar Detailing division is headed by a Project Manager and consists of multiple teams.
  • Each team is headed by a Project Manager and consists of Team Lead, Senior Checkers/Checkers/Senior Detailers, and Detailers.
  • We follow international consulting practice.

 

Our Quality

 

  • By the process of two sets of checking (One is self-checking by the detailer and the other one by the Checker) and a final quality check by the Project Manager/Team Lead, our drawings eliminate the possibility of errors.
  • We also provide user-friendly shop drawings for the Placers to arrange the rebars in the site without any difficulty.

 

content design image

Our Projects

 

  • Residential & Commercial Buildings
  • Industrial Buildings
  • Stadiums
  • Bridges
  • Railway Yards
  • Water treatment plants
  • School Buildings

 

content design image

Our Major Iconic Projects

 

  • 308-North 7th Street
  • 120- Water Street
  • 175- Second Street
  • SDW West Boylston
  • New Mid Suffolk Electric Yard
  • 102-Charlton Street
  • Cabot School

 

Rebar detailing

 

 

 

 

Our Latest Projects

BROWN ROAD BUILDING 100 & 200

Project Location : Gwinnett County, Ga

Type of Project : Building

Number of Floor : One

Scope : Spread footing, Continuous wall footing, Slab on grade & Tilt up panels

Tonnage : 716 Tons

Highlights : 25% cast in place concrete &75% panel work. Tiltup panels are supported by the continuous footings. Panels bar lists provided for the requested pour sequences.

MIT RAGON INSTITUTE

Project Location : Cambridge, Ma

Type of Project : Institutional Building

Number of Floor : 9 Floor (P2, P1 & Level 1 to 7)

Scope : (All Cip) Foundation And Super Structure

Tonnage : 725 Tons

Highlights : Two floors of basement are surroundings by slurry walls and cap beams.
Large mat foundation (4’-0” thick) with 260 tons.
Large quantity of formsaver system used in foundaton mat, sog, shear walls and basement & upper slabs.

THE ARMORY

Project Location : Paterson, NJ 07501

Type of Project : Residential Apartment

Number of Floor : Seven

Scope : (All Cip) Foundation And Super Structure

Tonnage : 1200 Tons

Highlights : basement and first floor with parking and other floors with residential apartment with elevated swimming pool at 2nd floor

Drop us a message

You're in the right place! Just drop us a message. How can we help?

Or see contact page
Validation error occured. Please enter the fields and submit it again.
Thank You ! Your email has been delivered.