This project consisted of 2 floors of ware-house building. Main building structures were constructed with structural steel using WF (Beams & Columns), Trusses, HSS Tubes, Channels, Angles, and Plates.
We detailed the entire structure using TEKLA, including but not limited to pipe support frames, different type of welded trusses, and grating supports.
Steel columns used bolted splice connections, as well as welded splices. Beams were mainly connected with bolts and nuts, using shear and moment connections.
Total Tonnage: 10500 Tons
Duration: 20 Weeks