This structure consisted of two levels of oil and gas platforms, with the whole structure modelled as module type structures. All connections were detailed as welded connections. We also detailed stairs, handrails, gratings, chequered plates, ramp and walkway platforms which are connected to module structures with bolt and nut connections.
Total Building Tonnage: 100 Tons
Duration: 6 Weeks
You're in the right place! Just drop us a message. How can we help?
Or see contact page